Showing posts with label round the twist. Show all posts
Showing posts with label round the twist. Show all posts

Thursday, January 3, 2013

2012 Goals

I did okay with my 2012 goals.  I am feeling good about what I did.  Some weren't met, but I overall I feel okay. 

- Spend time with friends or have some solo time without DH & the kidsI lucked out that my dear friend Meredith got a job that is right around the corner from my job.  So we have lunch 1-2 times a month.  And a coworker has become a great friend.  We meet about 1-2 times a month.  Yes, it is confined to lunch, but they are one-on-one interaction with friends.  And I got very lucky and saw my dear friend Karen twice this year.  Given she is in AZ, that is terrific!  We have had multiple years when we haven't gotten to see each other.  I did also get to the girls weekend with some of DD's college friends & their wives.  That was great.

So no, I didn't get a lot of solo me time.  But I have gotten to connect more with friends which makes a huge difference!  Definitely happy that I have gotten some more time with friends.

- Complete at least one pair of socksDone!  I am proud to say I actually got *four* pairs done.  Woohoo.  *happy dance*  (Wish that one pair didn't have cashmere...*sigh*  Too itchy to wear long.  I know...I am weird.)

- Put buttons on at least half of my WIPs with missing buttonsThere were 12 WIPs.  Seven missing buttons & one waiting on beads.

Out of the eight that were missing buttons or beads, they are all done!
Finished:Simple Shrug for 18" Doll
Shrug for DD
Baby Jacket with Moss Stitch Edges
Aviatrix Hat for Ella - ended up on Will!  Too small for E
Simple Cardi for Bella Ella
Cardigan for My Hobbit Elanor
Beaded Evening Bag/Purse
Crest of the Wave Scarf

The remaining 2011 WIPs & Status:Suri Bias Scarf - Done
Flora Dress - Completed knitting but waiting on elastic which I swear I purchased already & won't find until I buy more elastic
Mary Janes for DD Daughter - need to frog.  Put in hibernation list but really need to reclaim the yarn.
Maeve Socks - 55% done - I don't honestly know if I touched these other than stealing one of the needles for something else...

The Maeve socks are beautiful.  The yarn is amazing and the color is intense and lovely.  So what's the deal you ask?  Cables.  Ornate cables that take a lot of attention.  A 16 row chart with things happening every row.   I still blame pregnancy hormones for casting on cabled socks three months before DS due date.  They are beautiful and need to be done!

- Have at least three dates with my DHI really thought I missed this one!  I was talking with DH about my goals (he asked me on New Years Eve if I had met my knitting goals sweetie that he is to remember.)  I had said I thought we only got out twice during the summer.  But then he reminded me that my darling SIL watched the kids while we went out to see a movie.  So three dates.  Hey, wait!  We also went out to breakfast while his sister was visiting the NJ shore during the summer.  So four!  Go us!

- SpinI did the Tour de Fleece.  Though as per usual with the Tour de Fleece, I use so much spinning mojo for that time that it drops off afterwards.  Though I did spin some yarn for DD's floating teaching assistant who is a knitter during December.  So I am thrilled.

- Get back to some activityThis was my biggest fail.  *sigh*  I am happy that I am walking to the PATH in the mornings.  I drop DD at school and then walk to the train station.  But that is only three days a week as I am currently working two days from home.  Mind you, most of the time on those days I am still walking her to school & then going home.  So that is some walking five days a week.  That is a major improvement.  But that is about it really.

Santa did get two dance games for the Wii but it is Just Dance Disney & Kids.  But they were mainly for the kids.  I have ordered Your Shape which is a fitness game with a camera.  I also got Dance on Broadway which is another dance game.  Silly, but I am hoping the kids like some of the songs so they will dance with me.  That has been the most fun about the dance games for the Wii. 

- The late addition - Four sweaters in 2012I added this in Feb. after listening to a Round the Twist episode about how 2012 would be the year of the sweater.  The goal was one for DH, DS, DD and her 18" doll.  Two out of four were done. *sigh* 

DS got a vest that was completed in March.  Looks adorable & should see if it still fits.  DD's was finished Sept. but of course lingered on buttons for two months.  It is kinda big though.  I made the 6 so she would have room to grow into it.  Probably should have done the 4.

DH's was cast on end of October.  Then I got involved with Xmas knitting...  So it has been lingering.  He said he wanted a certain sweater based on something he read in a Star Trek book over a decade ago.  It is your basic cardigan with pockets.  AKA super dull.  Of course since then he said he would have been happy with a dozen other things.  *laugh*  But it is good tv knitting. 

It cracks me up that I haven't finished the *littlest* sweater of the lot, the one for the 18" doll.  The pattern is to match DD's.  So I think since hers doesn't fit her well yet, I haven't been as motivated to finish it.  Also, I sometimes wonder if I don't love her 18" doll more than she does.  *grin*

So I met most of my goals.  And didn't meet a couple.  But overall not bad.

I just watched the Round the Twist podcast where she reviewed her goals.  And guess what?  She didn't meet one for the four.  *laugh*  Mind you, she had a whirlwind year that ended with her getting married in November.  So you can't blame her.  She decided this year there aren't goals, but just to enjoy knitting.



I will follow this post with my 2013 goals.  Figure this is long enough already!

Tuesday, November 20, 2012

Feeling Productive


I have had an amazingly productive couple weeks.  A lot was that Saturday I sat down and focused on all the WIP that were lingering with missing buttons & such.  I also finished a scarf that had been started in 2009.  Woohoo!


The 2012 goal was "Put buttons on at least half of my WIPs with missing buttons".  I have met that and kicked its tush.  There were 8 with missing buttons & 1 with missing beads.  I am down to ONE!  Woohoo.  I am feeling very accomplished.  We are not gonna talk about the one that has been done all but *one* missing button since 2008...  *laugh*

WIP as of Jan. 2012 & Status
Done - Simple Shrug for 18" Doll - Done 1/29
Shrug for DD - Done 1/29
Baby Jacket with Moss Stitch Edges - Done 2/6
Aviatrix Hat for Ella - Done 2/6
Crest of the Wave Scarf - Done 11/11
Suri Bias Scarf - Done 11/17
Beaded Evening Bag/Purse - Done 11/17
Simple Cardi for Bella Ella - Done 11/17

Still WIPs -
Maeve Socks -
These are back in the rotation after months of being in limbo.  They are challenging still with all the cables.  But they are being worked on which is something.

Flora Dress -
The knitting done but needs elastic added to the body which I bought and can't find.  *sigh*  I fear it may be too small by next year when DD could wear it.

Mary Janes for DD Daughter -
Think these are too small & need to get frogged.

Cardigan for My Hobbit Elanor -
*blush*  Still missing the #@*$ buttons.  Mind you, they are toggles so they require i-cord rather than just attaching.  However, this sweater too small for DD and may be too small for the Little Guy if I don't get them on there soon!

Items with Buttons New for 2012 -

Phoebe Sweater for DD Elanor - Done 11/17

Finished Projects -
I have actually finished SIX, yes six in the past nine days!  It is astounding.  Though a whole lot were adding buttons.  But I did complete a scarf in two days for Elder Munchkin out of some handspun.  It was bulky, but still.  Add to that the Vernal Equinox Shawl Surprise was completed October 29 and the Lady Bianca socks were done on the 20th.  That makes eight projects in a month!  Mind you, four of those were adding buttons or in one case beads.  But hey, it is a win!

I need to take pics of these things though.  There are a whole lot of Needs Picture icons on them.  *laugh*  (I do that so the sidebar code doesn't get mucked up.  It doesn't seem able to handle it if there isn't a pic.  Though I bet Casey on Ravelry has changed the code & it could probably do it now.  But I am too lazy to go deal with new code.  *laugh*)

I went to take a pic of EM with her scarf.  But I left my phone at home today!  So no pics.  *grumblegrowl*  Ah well.  Another day.

I have too much work to go over all the finished objects.  I should take some pics and then talk about them all.

It is nice to feel productive!

Monday, March 26, 2012

Festive Fall Vest for DS


Here is a Ravelry link to the project.

As per usual, I can't get pictures to do the yarn justice.  Though Little Guy's adorable face should make up for that.  *smirk*  Yes, I am a biased mommy...  Why do you ask?  *laugh*

Little Guy in Chris Woven Yoke Sweater

There are a bunch more pics on Flickr.  I just posted the one I liked best of LG.  *laugh*

Pattern:#407 Chris Woven Yoke Vest by Schaefer Design
From the 2012 Knitting Calendar

Made for:DS Will

Size:12-18 Months

Needles:US 6 - 4.0 mm
US 7 - 4.5 mm

Yarn:
Fresh From the Cauldron MCN Worsted in Ares Colorway
About 1 skeins = 185.0 yards (169.2m)
Purchased at:
Fresh From The Cauldron
Purchase date:
May 2, 2011

I love the Ares colorway by Fresh from the Cauldron and wanted to make something for the Little Guy with it.  The colors scream fall though I don't know if it will be big enough for him to wear come fall. 

I have been watching to the Round the Twist videocast.  Carin, the host, has deemed 2012 the year of the sweater and has invited others to KAL with her.  I decided I wanted to push myself.  So one of my 2012 goals is to knit four sweaters.  One for DH, DS, DD and DD's 18" doll.  This is the first sweater done.  And certainly not too soon!  I fear it probably won't fit him next year.  But it fits him perfectly.  And luckily the temperatures have dropped so he might get a few wearings out of it.  *crosses fingers*

I tried to use this for another vest that just kept going horribly wrong.  So I frogged it. 

I kept praying that there is enough yarn to finish the vest.  Problem was that is says 1 skein of Chris which is 220 yards.  FFtC is 185 yards.  *gulp*  Luckily some amazing folks offered to share their Ares, so I could have finished it.  Hooray for knitters.

It came out wonderfully.  It looks adorable.  And just in time too.  The vest will probably only fit for the rest of the spring.  *sigh*  But I might have to take up an offer to buy some Ares and make another one in a bigger size as I have a bit left from the 12-18 size.

I love the Chris yarn too.  So I might have to get a couple skeins and make a larger one at a later date!

I also really need to take pics of my socks.  They were another 2012 goal I have met.  They look wonderful, but I haven't photographed them or worn them yet.  I really should since the lovely FftC folks are having a 2012 KAL that ends in April.  I keep debating if I could actually finish another object for that one.  I don't know...but it is tempting to try!  I have long been debating making a Clapotis with some FftC yarn.  Thoughts?  Crazy to think I can complete that in a month with everything else on the table...  But I think it is a quick knit by most accounts.

On the 2012 goals, I also have done some spinning!  Woohoo!  I have the Bullseye Bump I got on my wheel.  I have only done about a half ounce to an ounce tops.  But it is lovely.  Again, I should take some pics.  I had high hopes of getting some spinning in last night.  But Little Guy is sick and was fussy most of the evening.  So there wasn't a chance to pull out the wheel.  *pout*

Also, because Little Guy was sick, I didn't get to do a bunch of car knitting.  That was my hope.  I wish he wasn't a drippy mess.  He was miserable on Saturday night/Sunday morning.  But luckily, he is doing better today.  I am hopeful that tomorrow will mean he is back to 100% okay.  *crosses fingers*  I am sure the sweater helped him feel better.  How can you not when you look so dapper?  *grin*

Friday, March 23, 2012

Knitting While Away


Given I was traveling to Arizona, I took lots of knitting.  I wanted plane knitting and conference knitting.  Conference knitting has to be something super simple that I can knit under the table.  Plane knitting can require more attention and focus.

Of course, I was winding yarn at 12:30 am Friday night into Saturday morning I was leaving. I had to be up at 3:30 am to get to my 6:30 flight.  Whee...  I know...not my brightest move...  *laugh*

I decided to go with the Holden Shawlette by Mindy Wilkes (rav link) for the Unique Sheep Luxe in the Tudor gradient colorway.  I was leaning towards the Aeolian Shawl by Elizabeth Freeman but I think the yarn will be too busy and you will end up loosing the details which seems silly for the pattern & yarn.  The beauty of the Holden is that I can repeat the edging as many times as I have yarn for.  So that helps.

It calls for a size 6 needle. So I brought a size 6 with me.  Not a 5 or 7.  Just a 6.  I started it on the plane.  And it looked too loose for my liking.  I kept trying.  I knit some more.  I stopped.  I decided that I would try to get a size 5 while I was out with a friend that day.  But I didn't.  So I tried to knit a bit more, seeing if I could convince myself that it would block out well and look good.

So I knit some more.  And stared at it.  Pulled it a bit.  Tried to justify it on the size 6 needles.  Thinking maybe the yarn will plump up when I block it...  *laugh*  Yeah, I know...

I knit on the vest for the Little Guy (rav link) for a while, hoping letting it sit would convince me it was the right thing to knit it on the 6s.  But the more I thought about it, the more I knew, I wouldn't be happy with it.  It just needed to be ripped out and knit on a smaller gauge needle if I would be happy with it.  *sigh*

Of course after finally committing to the Holden, I was looking for something else and found the Bitterroot pattern.  Now I am wondering if that wouldn't be a better fit. *laugh*  Decisions, decisions...

I did a lot of the vest under the table at conference.  It was going well.  And then...  I realized that I copied the same side of one sheet twice!  So I didn't have the last quarter of the pattern!!  *laugh*  Okay...  Thank goodness I brought more to knit right?!

So I cast on the Phoebe Sweater for my Eldest Munchkin.  It is a bottom-up seamless cardigan.  I *love* seamless sweaters.  *smile*  It is a super simple knit and ideal for conference knitting.  So I put a pretty good dent in that.

I decided I wanted to cast on my socks that I brought as well.  I decided to go with the Midnight Sky pattern - non-rav link with really large pic if you click on it  (Ravelry Link).  I got the pattern from the Decadently Dark club I was in a while back.  I couldn't lay my hands on the pattern and the designer was sweet enough to send me a new copy which is very cool of her as it is a pay pattern.  It is a beautiful pattern and I always think that it is good to support patterns that haven't been done to death.  It says three projects on Ravelry.  One the test knit.  The other says in progress with the yarn from the club (which I got in Aug. 2009). The last the one I started.

Posting mine is probably a bit of a joke.  Why you ask?  Because I have cast on the stitches for 1 1/2 socks.  Yes.  Not even all the stitches yet.  *laugh*  Mind you, when I am doing the two socks on two circs I always seem to have trouble getting the cast-on right!  *laugh*  I generally end up sliding one set of stitches on to something else because I have cast on the second one incorrectly.  Which I hate to admit is what is holding up the progress.  And since I wasn't at home I didn't have other needles to put it onto. Though I did have some stitch holders, so honestly, I could have done it...  Though I think what added to my procrastination is that I don't think two socks on two circs are great plane knitting.  Too many needles to make the person sitting next to you nervous.

Though if I had realized the seat between me and the other person would be open, I would have finished casting them on so I could knit them on the plane.  But with my luck, if I had them in my carry on, I would bet someone would have been in that middle seat.  *laugh*  So better left in my checked baggage!  *grin*

So as things stand, I have about 75% of the vest done for LG.  About 40-50% of the Phoebe sweater done for EM (it is the project I have been knitting on since getting home).  0.005% of the socks for me done.  0% of the shawl done.  Whee.

Much to my joy, I got a little spinning done last weekend...  A very little.  But I am so thrilled I got any done at all!  I pulled out a sample I got from an order I placed to test out my skills.  I am happy to report that muscle memory is a wonderful thing.  After only a bit of trial, it was looking about as good as my spinning ever looks.  I am not an expert spinner by any means.  But it was fairly decent.

So I pulled out the Bullseye Bump I got.  It is so wonderful to spin.  I am still debating if I will just knit this as a single or if I am going to Navajo ply it.  I *never* knit with singles I have spun.  I am not that strong a spinner so my singles are uneven in tension.  Plying helps balance that out.  But since I am planning to make a simple scarf for Elanor with this, it might be okay.  Some odd bias to it could be fun & funky.  We will see when I get the single spun how thick it is.  Because the bump has various fibers mixed in like recycled sari silk and such, it is unpredictable.  But I think Elanor will love the colors and the sparkle in it.

I am hoping to have some knitting time in the car this Sunday.  *crosses fingers*  As always, that will all depend on the kids...  But with any luck, maybe I can take a second try at the shawl.  Let's hope.  *smile*  Though I will also see if I can finish casting on my socks as they might also be nice car knitting.  But who knows...  I do wonder if trying to get two pairs of socks done in a year isn't a rather grand idea.  *laugh*  I recall knitting a pair of socks every month to two.  What a laughable idea these days... *chuckle*

I was just looking at my WIPs and realized I really should pick up the Flora Dress (rav link).  Because if I don't finish that quickly, it isn't going to fit Eldest Munchkin and I will just have to frog the whole thing.  I should check that it even fits her anymore.  I checked a couple months back but she has this nasty habit of continuing to grow.  *laugh*

In a Ravelry thread I read about updates for a yarn dyer I love, someone mentioned not having knitting time with kids which definitely seems true.  But she also said that she built her stash to save for retirement.  It seems like a fine idea to me.  Though to contrast that, I also caught up on the Yarn Harlot's blog.  And her post about how she only keeps things if she really loves them seems like a good policy.  But then again, I don't get given yarn or fiber as she does.  *laugh*  So 95% of the stuff I bought.  And the gifts I got I love.  There are some things I bought because they were cheap.  Like some acrylic I got for trying up yarn when I was dyeing my own what seems like ages ago...  Some is about it being cheap.  Which with the kids...  So I don't think I need to love all my yarn.  But I do need to think it is useful.  Mind you, there are more things I find useful these days with the kids.  So I suspect I won't be doing much culling should it ever actually get the time to do it.

I have a ton of work to do.  It has been a crazed week.  I have been up til 1 or 2 twice this week with work.  *sigh*  Best I get some done though I really just want a nap.  Ah well.  No rest for the wicked...or at least want to be wicked.  *chuckle*


Wednesday, February 1, 2012

That Carin Has Me Thinking about Goals Again...

I swear, I should stop watching Carin's Round the Twist podcast because it keeps inspiring me to take on things!! *laugh*

She has been saying it is the year of the sweater for her.

I kept saying she is a faster knitter than I am...  But of course, hearing it again, the thoughts crept in...maybe I can do this.

So long as kids sweaters count, I think I am in.

My goal is to knit a sweater *and* put on the buttons on a sweater for DH, DD & DS as well as the 18" doll my DD has.  So four sweaters in a year.   *gulp*

And if I push myself, I should figure out what to do with the alpaca cardigan (rav link) I started for myself in deep hibernation.  It is too small for me at my current size.  I should decide what to do with it.  *sigh*  I am so not good about ripping projects with this much done and don't think the alpaca will do well with that.

For DH I have some sport weight yarn heather grey yarn I bought for him to make a sweater ages ago.  I said it would get started after I finished mine.  Hardly fair to hold to that given the deep freeze my sweater is in.

I have at least a half dozen sweaters queued for DD.  I have a book to make a matching one for her 18" doll.  I haven't decided if I just want to scale down a sweater or use one from Knits for Girls & Dolls book I got.  Though in looking at patterns for DS, I discovered the Phoebe's Sweater I have been wanting to get is in the weight of yarn I have already bought... Hmmm...  Could be a sign.  It comes with a doll pattern as well.  Though it might be small and need tweaking but of course in checking Ravelry someone has already posted the needed mods (another rav link).

DS is only 10 months old.  So of course I am thinking about taking the coward's way out and knitting his first.  *laugh*  But then again, DD loves anything knit for her and doubly so if the doll has one too.  Soo....  Decisions decisions!