Confessions of a lazy knitter. Michele /akkasha's knitting journal. Mostly a place to babble about my latest projects.
Thursday, November 10, 2011
I Want It!
The woman who does it recently showed off some bags. I *want* the Starry Night Dr. Who bucket bag! The seller is all out of those bags. I really want to know where she gets the fabric.
The seller also has a box bag in Tardis fabric. I like that one too. But the Starry Night/Dr. Who combo is too wonderful. I actually just wish the Bucket bag had a drawstring or something. But otherwise it is a lovely bag.
I realize that it really does seem like one can never have too many project bags. *laugh* Mind you, most of mine are cheap bags I have gotten free at work or something. My current project bag came from my local health food store that was giving me one every time I shopped there. So I have about 5 of them. And they are super useful.
Back to work with me!
Tuesday, December 11, 2007
Finished Object Disaster
Well, it was bound to happen sometime, right?
I screwed up the Tomten sweater. In a big way.
I kept thinking while I was doing it that the sleeves seemed kinda small. But I figured it was just I am not used to looking at baby stuff.
I was seaming the sleeves this morning and knew they just weren't right. *sigh*
The light bulb went off in my head.
I double checked the pattern.
Sure enough. The sleeves say to decrease every 4 ridges. And I thought that was every 4 rows. So it is half the length it should be. *sigh*
In theory, I could rip back the sleeves and just redo the sleeves. But that isn't the only problem with the tomten. I was learning how to do two color work (technically, intarsia, but honestly, not that complex). I didn't realize there was a specific method to follow. So I was wrapping the yarn pretty haphazardly. So I made a mess of the front of the sweater. I wasn't happy with it as it was anyhow. I kept debating just pulling it all out but couldn't bring myself to do it.
I think the sleeves are just a sign to start over. I can do a much better piece and it will be something I won't be embarrassed to give away. *sigh*
Live and learn. Live and learn.
The good news is that I have time to get it done before Xmas. It only took about a week and a couple days to finish this one. And I have vacation starting Friday. So I will be off work. That gives me even more knitting time.
I have to confess. I haven't done squat with Jennifer's xmas socks. Then again, we haven't scheduled a time when we are going down to celebrate Xmas. So I know I have until at least mid-January to get those done.
I will cast on a new Tomten sweater today. I am hoping to spend my lunch with a coworker helping her learn to knit. I have already taught her some things. Thing is, one of her kids pulled her knitting off the needles. So I need to get it back on the needles for her.
I wish I had some extra circulars to lend her. I really do agree with Kelly at Knitpicks. They are great even for learning students. I listened to the podcast 28 which was about sharing the love yesterday.
Though I disagree completely about not having people start with a project. I *hate* not feeling like I am working towards something. I would rather have it be a mess, but doing something rather than working on something only to rip it all out. I love my sampler scarf. I love that I can see my evolution in knitting in it. I like having a project rather than nothing when I am done.
I think people differ a lot in what style of learning works for them. So it is never one size fits all. *smile*
Ah well. I have to get some work done today. Especially as I am taking off Friday through the New Year! Means lots of knitting time. *grin*
Tuesday, October 16, 2007
Drop Stitch Scarf in Recycled Silk
The color on the pic isn't great. Hard to get the depth of color. I really shouldn't take pics with my camera on my phone. They always come out more grey and dark. I tweak them as much as I can, but it is still not really great.
Pattern:
Double Dropstitch Scarf Pattern
http://freshgroundknits.com/patterns/drop-stitch-scarf/
Yarn:
Recycled Silk Yarn
3 skeins - 150 grams (0.33 pounds)/approximately 85 yards per skein
Needles:
Size 8 of the Knitpicks Options circs. Love those needles.
Have to say, the yarn is pretty rough and gets twisted pretty easily. I chose the pattern as it would mean large areas that I had to knit less with the yarn overs.
I cast on 48 stitches as I wanted a wider scarf. Though I think it may be too wide. I am nearly done with the first ball and it is only about 12-14" long. Whoops... *frown*
I don't think I will have enough for a full length scarf unless I get more yarn. I suppose I could make it as a table piece or something. I really don't know.
There are some people on Ravelry that are willing to sell their recycled silk yarn. I should check to see if any have it cheap enough that it would be worth grabbing. But the theliteracysite.com has increased the price to its normal price. And for $9 a skein, it is not worth buying it.
I started this as a project that I could give away for Xmas. I was thinking it would be good for my sister, Millie. I suspect it will go to her. Not sure if it will be this Xmas or not. Kinda depends on if I can get more yarn or what I suspect. It is an easy knit so I can't complain about that.
More work to do. Still have a couple more things I mean to post about today. Hopefully, I will have some more time. But maybe it will wait til tomorrow.
Monday, September 10, 2007
Daaaaammmmmmnnnnnn!
Daaaaaammmmmnnnnnnn! *in my best impersonation of Jim Broadbent as
I have been having a lot of fun with Chore Wars as my 'party' is the one set up by Lime & Violet. So I can enter knitting stuff and level my character. Yes. It is ubergeeky. And I love it. *laugh*
So I went to enter my evening knitting on Friday. I want to show Paul as a fellow geek. I am entering some stuff. He looks. All is fine. Then I enter another hour of knitting. Then Paul looks again. What does he see? My lunch time knitting which says "Sock for the hubbin for Xmas".
Daaaaammmmmnnn...
So he knows I am knitting him socks. *pout* I am not even sure I will finish these for Xmas. I really thought I would be further along as I bought the yarn in June... But I only have an inch done of the cuff. Long saga but there has been a bunch of things that slowed me down (including a lot of frogging).
Mostly I have only been knitting them once a week at my WW meeting so there is only about 15-30 minutes of knitting a week. I kinda figured I would have to start taking them on the train during the week to get them done if there were going to be finished for Xmas. *sigh*
But now he knows. *pout* Told him he may not get them this xmas. Of course, he is saying I should just give them to him for his birthday so I can bring it home! *laugh*
I still am not sure he will actually like it. The colors are right, blues & greys. Ideal colors for him. But he says he doesn't wear striped socks. I got the Opal Rainforest Frog from simplysockyarn.com. Also, he is always warm so wool is probably not a great solution either. *pout*
Ah well. He knows. So I guess I gotta get my tush in gear on these.
*grumblegrowl*